Nine lines, four stages, one subject
All of them are forms of the same thing: territorial asset management, interference analysis, territorial compatibility, long-term planning and territorial intelligence. Each is described by what it produces and by the framework that governs it.
Know
Territorial intelligence: what is really on the ground, beyond the map.Territorial Intelligence
Core lineGISRemote sensing
Why does every department have different data on the same asset?
Territorial information gathered, verified and cross-checked to answer decision questions, rather than to accumulate layers.
- Territorial asset inventory
- Technical cartography
- Accessibility and travel times
- Satellite monitoring
Scope and outputs are defined with each organisation, after a first meeting.
Fit
Interference and territorial compatibility: whether the project can coexist with what exists and with what is coming.Mine Planning with a Territorial Perspective
Long-term planningMine design
Does your mine plan fit the territory you hold?
We analyse pit growth, waste dumps, leach pads and infrastructure together, so that each facility sits in its optimal location. We treat the operation as a system that grows over the territory, not as a set of independent sites.
- Layout of pit, waste dumps, pads and infrastructure
- Evaluation of the mine plan across its life cycle
- Water, energy and permits the plan needs
- Mine design and sequencing
- Territorial footprint of the mine plan
- Safeguarding future resources
- Territorial review of the mine plan
Scope and outputs are defined with each organisation, after a first meeting.
Led by Rodrigo Ramírez, a specialist in our network with 20 years in mine planning and mine design →
Siting and Territorial Compatibility
Core lineTerritorial Compatibility AnalysisTerritorial and regulatory pre-feasibility
Where can it be built, and will it still be viable in ten years?
Before the site is chosen, we compare where a plant, a storage facility, a desalination plant or a terminal can go, and what each location requires under the legal regime of its land. After it is chosen, we measure whether that decision remains valid in five, ten or twenty years.
- Site selection
- Territorial and regulatory pre-feasibility
- Coastal zone and maritime concessions
- Assessment of siting alternatives
- Territorial Compatibility Analysis
- Siting validity period
- Portfolio interference diagnosis
- Interferences between facilities
- Territorial due diligence
- Inputs for the application
Scope and outputs are defined with each organisation, after a first meeting.
Territorial Risk and Operational Continuity
Disaster risk managementOperational continuity
If the only access road is cut tomorrow, how many days can the operation keep running?
The emergency plan describes today's risk. We tell you where the operation is exposed, how long the response takes to arrive, and when that risk changes as the mine plan advances.
- Natural hazards
- Exposure of critical infrastructure
- Access redundancy
- Response times
- Cartography for emergency plans
- Geospatial support for incident management
- Exposure window
Scope and outputs are defined with each organisation, after a first meeting.
Enable
Assets and regulation: what it takes to make the project possible in practice.Mining Property and Easements
Core lineChilean Mining CodeDecree Law 2,186
Which concessions expire this year, and who is watching?
The concession exists on a map, but the project happens on someone's land. That gap is where months are lost.
- Mining property register
- Title analysis
- Mining easements
- Surface and subsurface compatibility
- Portfolio administration
Scope and outputs are defined with each organisation, after a first meeting.
Land Management and Territorial Regularisation
SII cadastreReal Estate Registrar
Ministry of National Assets
Does the land the operation occupies match what the SII, the Real Estate Registrar and National Assets say?
A project's territorial base is spread across registers that do not talk to each other. We deliver the difference between what those registers say and what exists on the ground, and what to do about it.
- Land diagnosis
- Reconciliation of registers
- Public land tenure
- Boundary georeferencing
- Regularisation of tax rolls
- Territorial conditions for the workforce
- Corridors and access
Scope and outputs are defined with each organisation, after a first meeting.
Territorial Tax Optimisation
Core lineLaw 17,235Chilean Internal Revenue Service (SII)
Are we paying property tax on land we do not occupy?
Property tax is assessed on what is registered, not on what the operation actually occupies. That gap is paid every year.
- Baseline of territorial tax burden
- Occupied area versus registered area
- Review of classification and use
- Exposure assessment
- Compatibility with closure commitments
- Preparation of applications
Scope and outputs are defined with each organisation, after a first meeting.
Environmental and Regulatory Assessment
Law 19,300Supreme Decree 40/2012
ILO Convention 169
Does this project change require entry into the environmental assessment system (SEIA)?
Permitting with an eye on the timeline, not only on the file.
- Inputs for environmental impact studies and statements
- Sectoral permitting
- Municipal permits and land-use compatibility
- Screening for SEIA entry
- Territorial engagement
Scope and outputs are defined with each organisation, after a first meeting.
Close
Long-term planning: how the asset ends, decided from the day operations begin.Mine Closure Planning
Law 20,551Supreme Decree 41/2012
Does the closure plan match the operation we have today?
Closure is not the last chapter of the operation: it is a variable planned from the day operations begin.
- Closure planning
- Preparation of closure plans
- Five-yearly update
- Partial and progressive closure
- Compliance audit
- Mine plan and closure plan reconciled
Scope and outputs are defined with each organisation, after a first meeting.
Three ways of working together
Capacity for a defined assignment, a speciality the internal team does not hold, or ongoing support through a monthly block of hours.